SUSTAINABLE
STORAGE
STORAGE

Paper and cardboard packaging industry

The challenge
A large logistics and industrial facility dedicated to paper and cardboard packaging, with high energy consumption associated with its production and logistics processes was already generating its own solar energy, but the real challenge laid elsewhere:
The solution
BeePlanet Factory designed, integrated, and operates a 455 kWh and 110 kW BESS system at the San Agustín de Guadalix plant, managed by BHive®, BeePlanet Factory's proprietary EMS.
BHive® acts as the brain of the installation: it analyzes consumption in real time, anticipates demand peaks and automatically decides when to charge and discharge the battery, without any intervention from the plant team.
The solar energy generated by the plant (201.8 kWp) that cannot be consumed immediately is stored and released when demand requires it.