Electric Mobility Industry

Fast Charging + Sustainability: Galp and BeePlanet Join Forces for an Electric Future

368 kWh
Batería BESS gestionada por BHive®
360 kW (2 cargadores de 180 kW)
Potencia del sistema
24/7
Gestión y monitorización del sistema
Cliente
Galp
Localización
Alcalá de Henares, Madrid
Aplicación/Sector
BCube®
Gestión energética EMS
BHive® - EMS BeePlanet Factory

The Challenge

Galp, the Portuguese energy company, has trusted our technology to power one of its ultrafast electric vehicle (EV) charging stations in Alcalá de Henares (Madrid).

As part of the "Second Life Batteries" project, a system using repurposed electric vehicle batteries has been installed to enhance charging capacity, reduce reliance on the power grid, and extend the useful life of these critical components.

The Solution

An energy system designed for ultra-fast charging hubs

At the heart of the project is our BCube®system, a containerized solution with 368 kWh of capacity, connected to two 180 kW chargers. Thanks to this configuration, it is possible to charge up to nine vehicles consecutively, using minimal power from the grid.

This type of installation is key for charging stations in complex locations to offer ultra-fast services without the need for costly grid upgrades

The BCube® helps to:

📌Minimize energy demand peaks

📌Increase the charging station's operational autonomy

📌Reduce the environmental impact of the full battery lifecycle

Discover how we can improve your energy management

We analyze your installation and tell you, with real data, how much you can save.
Discover other cases
De consumidor masivo a nave energéticamente inteligente
View case
Energy Storage for the Precision Electronics Industry: The Piher Sensing Systems Case Study
View case
From Grid Limitations to Fast EV Charging in A Gudiña
View case
Fast Charging + Sustainability: Galp and BeePlanet Join Forces for an Electric Future
View case
How A Gas Station Enabled Fast EV Charging Despite Grid Limitations
View case
94% Renewable Self-Consumption for Comansa: Savings and Energy Stability in the Industrial Sector
View case
Maximizing Solar Energy at Ansasol's Photovoltaic Plant
View case
BeePlanet and Sirea in France: Solar self-consumption, storage, and off-peak charging at a concrete factory
View case
Efficiency and Fixed Cost Reduction in the Food Industry
View case
Solar Surplus Optimization at Extremadura I-II-III Photovoltaic Plant for ACCIONA Energy
View case