The Challenge
The Extremadura I-II-III photovoltaic plant, operated by ACCIONA Energy, is a renewable generation facility with a total capacity of 125 MWp, designed to provide clean energy to a wide range of customers. Committed to leading the energy transition, ACCIONA Energy was looking for a solution that would not only optimize the use of the solar surplus generated, but would also reduce its dependence on fossil sources.
The main challenge was to implement an energy storage system (BESS) capable of:
The solution
We designed and implemented two custom solutions based on our containerized BCube®systems, optimized to adapt to ACCIONA Energía's needs:
Both systems offer a combined capacity of 2 MW / 5MWh, allowing for: